External wall rendering in Alton

Heath plastering and rendering applies External wall rendering in Alton, so outside brick and block in Holybourne and Anstey gain one even face that throws rain off.

Calls answered 24/7

  • 38 years trading
  • Local to Winchester
  • Clear, upfront quotes

Alton outside rendering quote

Heath plastering and rendering sets the Alton quote for the outside coat before any mixing starts. The quote includes a firmness check, a combed opening layer, the main thickness of sand and cement, and metal angles on corners and around openings. More wall changes the quote. A taller frame changes it. A patterned close differs from a smooth rub. The whole house, the triangular end wall and a wall around the garden each has its own quote.

From £3,000

Included

  • Preparing the wall and checking it is sound
  • Scratch coat and render coats in sand and cement
  • Beads at corners, reveals and the base of the wall
  • A smooth or textured finish, as chosen
  • Taller Alton walls need a bigger scaffold, the working platform of boards, than a garden wall of low height. The extra boards change the quote.
  • A patterned Alton finish and a smooth closed finish do not share one quote.
  • Colour after the Alton coat has hardened is quoted apart, and so is mending of gutters, roof coverings or windows.
  • We keep the arranged time for the Alton render. The quote named before the coats start is the quote for those coats.

View the external rendering cost guide for Alton

External wall rendering across Alton

We serve Alton from our base in Winchester.

HolybourneAnsteyGU34

What happens on the day

On an Alton render day we put the standing frame up first. The sand and cement stay unmixed until that frame is up. We cover the glass and the ground next. We wash the masonry after that. A combed opening layer follows the wash. We draw the main thickness level once that layer can carry it. We rub the last face shut, or we leave a pattern in it. We then leave it until it is hard.

  • Alton houses before the first render coatScaffold is a temporary working frame for External wall rendering in Alton. It gives a standing place while each coat is spread. We put that frame up before any mixing starts. Sheets go over soil and over paving. Glass is covered. Doors are covered. We wash the masonry only after the covers are down. A clean masonry face lets the opening layer take hold. Boards have been set against the front wall of a house while render was spread. Boards have also been set along one side of a house while the same coats went on.
  • Combed cement and metal edges on Alton wallsWe check the Alton masonry for a firm face. After that check, the opening layer goes on. We call this layer a scratch coat because we drag a comb through the soft sand and cement. Those dragged lines give the next thickness a lock. Corners get a bead, which is a narrow metal trim, so each corner dries straight. The same trim goes into the reveal, the side cheek of a window and of a door. It also goes along the bottom edge at ground level. On one job, render filled the cheek around a black front door of six panels, with red brick pillars either side. On another wall the lower band is grey against a cream face, and a line of loose stones sits at the stop of that band.
  • One flat plane of render on an Alton wallOnce those dragged lines have firmed, we trowel the main thickness of sand and cement over the Alton wall. We level that thickness with a straight edge, a long bar drawn over the wet thickness until high spots drop and the wall looks level. Patchy brick and earlier repairs sit behind this thickness. Rain meets the new face. The wind meets that face too. The brick is no longer the outer surface. Render has gone on the upper triangle of a house, the part shaped by the meeting roof slopes. Render has gone on a flank beneath tiles that are red. A smooth face has been taken up to the point where those tiles start.
  • A rubbed finish or a stony face in AltonBefore the closing layer on the Alton wall, you tell us if the face should shut smooth or keep tool marks. The tool for that pass is a float, a broad flat blade. Drawing it over the wet surface leaves the face shut and smooth. If you asked for a pattern, the marks from the tool remain. Pebbledash means small stones are pressed into the render. That stony face has been used on the inner side of a parapet. A parapet is the low upstand that runs around the edge of a flat roof. One parapet length has been finished red, and the length beside it has been finished ochre. A textured face has been stopped just beneath a gutter.
  • Colour on hardened render in AltonThe fresh coat on an Alton house has to harden before colour goes near it. That wait is called curing. You name the colour at a later visit, or the coat stays without paint. Mending a gutter, a roof covering or a window is a visit of its own. A rear extension wore brown render, with its window covered and its door covered while the coat went on. French doors in a rendered wall open out to paving. A garden wall of low height has been rendered while covers stayed on the soil next to it. We take our tools away. The garden is tidy at the end.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose Heath plastering and rendering

  • Repeat customers and word of mouth

    The reputation is word of mouth, repeat customers, and the finished work.

  • Punctual and honest

    On time, and to the price you were given.

  • Tailored to the job

    The work follows the job, the timing, and what the room needs.

Photo of Gary HeathGary HeathPlasterer
Reviews
179
Rating
4.9
Trading since
1988
“We have been plastering and rendering since 1988. Every job, big or small, gets the same care, and we leave the place tidy when we go.”

Gary Heath, Heath plastering and rendering

Book Now

Photos of our work

Plastered chimney breast with a recess for a TV and a lower recess showing the brick
Plastered stairwell wall and ceiling above bare stair treads
Rear garden extension in a brown render coat, with the window and door masked for the work
Plastered room with French doors and side windows opening onto the garden
First render coat going onto the side wall of a flat-roofed extension, partly combed
Timber stud framing for a partition, before boarding

External wall rendering for Alton houses

Still have a question?

Do you render the outside walls of houses in Alton?

Heath plastering and rendering renders outside walls in Alton. Outside brick receives the coat, and block receives the same coat. The wall then shows a single plane, and rain runs off it.

Does rendering cover Holybourne, Anstey and the GU34 area?

Yes, Holybourne, Anstey and other Alton houses in GU34 are covered from our base in Winchester. One wall, the gable under the roof slopes, a wall around a garden, or all the outside walls can each be done on its own quote.

When can outside rendering in Alton be booked?

Outside rendering in Alton is booked for the months from April to September, because the weather then suits sand and cement and the fresh coat can go hard. Book Now is where that rendering is booked, and we keep the time that was set. A call about that booking is answered whenever the telephone rings.

Have you rendered gables, parapets and extensions?

A gable on a house has taken render, pebbledash with small stones pressed into the render has gone on the inside of a parapet on a flat roof, and a rear extension has worn brown render while its window was covered and its door was covered. Gary Heath, plasterer, said: "We have been plastering and rendering since 1988. Every job, big or small, gets the same care, and we leave the place tidy when we go."

After booking, what takes place at my Alton house?

The visit at your Alton house starts once you have booked with Book Now. We stand the frame, wash the masonry, comb the opening layer, then draw the main thickness level to the smooth close or the pattern you named. Ground sheets come away once the coat is on, and that garden is left tidy.

Book or ask a question

Calls answered 24/7